When Everyone Can Walk the Model, Projects Decide Faster: The Trondheim Community Sports Centre
A $90M, two‑year civic project in Norway opened its federated model to 100+ people—users, regulators, engineers, and owners.
The result: earlier objections, clearer trade‑offs, and decisions that stuck.
The first time the signage team stepped into the virtual lobby, they didn’t start with fonts. They stood at human height, looked across the retail entrance, and realized a column clipped the main sightline. Five minutes later, a saved viewpoint, a note on wayfinding value, and two layout options were in the issue log.
No speeches. No slide deck. Just the space, at 1:1 scale, making the decision obvious.

The project
Budget: $90 million
Timeline: 4 years.
Participants in Vrex: more than 100 people across roles.
Who walked the model
- 55 future users evaluating their workplace
- 14 discipline leads across BIM disciplines
- 5 maintenance specialists
- 3 municipal regulators
- 2 safety officers
- 5 site logistics planners
- 2 architects and 4 interior designers
- 3 owner reps
- 3 signage specialists
- 12 others (investment directors, city officials, department heads).
In total
32 specialist
70 non-techncial stakeholders

What changed vs the usual “one person drives” review
Instead of a single model-dirver, using screensharing while everyone else talks in turns, the team used Vrex to let people explore at true scale on laptops, in VR, or on room displays. They saved viewpoints to capture evidence, left markups, and linked each decision to a visual record.
Crucially: hundreds of walkthroughs happened without the need for any facilitation by the core technical team. Groups self‑organized, reviewed asynchronously, and arrived at workshops already aligned on facts and requirements.
The cross‑discipline knots they untangled early
Three practical dependencies drove most of the tension—and progress:
- Emergency exits and equipment: Walking real paths surfaced where code width met human comfort, and where hardware placement pinched routes.
- Facility placement: Small moves of rooms and plant had big ripples in structure, services, and wayfinding. Seeing adjacencies at 1:1 made trade‑offs concrete.
- Structural constraints: The moment a beam or column cut a line of sight or a maintainability envelope, the conflict became a shared problem to solve, not a drawing note to debate.
Because those topics were addressed before stage‑gate lock‑ins, teams chose good solutions instead of working around baked‑in problems.

Moments that mattered
- Maintenance rehearsal: A tech checked lift paths and reach envelopes around rooftop equipment, catching a working‑at‑height anchor requirement while changing it was cheap.
- City‑centre logistics: Planners walked load‑in routes and staging zones over a fused model of the building and streetscape, stress‑testing deliveries without a site visit.
- Retail value: The signage team used human‑scale sightlines to argue for a small lobby re‑order that improved tenant visibility—increasing expected lease value with negligible cost.

Outcomes the team could feel
- Continuous insight capture from a wide range of specialists and stakeholders.
- Regulator objections surfaced early, when fixes were measured in hours, not weeks, and fines were not considered.
- Higher satisfaction: Even contributors whose suggestions didn’t make the cut felt heard because evidence—not hierarchy or poor planning—won the day.
The critical insight: Breadth of access drives project success Trondheim shows that when more of the right people can walk the same space, in their own time, alignment stops depending on heroic facilitation. That lowers decision latency and prevents late‑stage disputes, fines, or design compromises. On larger programs, the effect amplifies.

Reference: How participation scales with project size.
- ~$50M project: roughly 120 participants have reason to engage with the models frequently.
- ~$300M project: 200–300 participants. More disciplines and heavier regulation, still manageable with clear roles and evidence packs.
- ~$1B program: 350–500 participants. Growth comes from additional trade subs, broader regulatory footprint, and multiple design/GC firms—capped by practical coordination limits.

Why it works
- Shared spatial understanding: Standing “in” the model collapses translation between specialists and non‑technical stakeholders. People see clearances, adjacencies, sightlines—no decoder ring required.
- Faster decision flow: Asynchronous self‑review means workshops start at option A/B/C, not “what are we looking at?” Most sessions move from problem discovery to solution confirmation in a single sitting.
- Evidence that travels: Viewpoints, markups, and short screenshot packs let decisions stick as people rotate in and out over a two‑year timeline.

A simple way to start
- Pick a challenging decision coming up in the next weeks.
- Connect Vrex to your CDE or drop a federated model export.
- Invite a mixed group of relevant team members (investment directors, operators, maintenance, safety, worker reps, etc.) for a 45‑minute working session. Capture two or three viewpoints, and make one decision that sticks. For most projects, this session alone can turn your ROI positive with Vrex.
- NOTE: Individual training for your team, as well as your external team and partners, is included with any Vrex package.